August 19, 2017

Hyd Lab PROJECTS (Experiences)

We have a relatively long history of involvement in the use of PHYSICAL HYDRAULIC MODELS: This dates back to around 1990 when working as the Drainage Engineer at Wollongong City Council Rudy utilised the Hydraulics Flume at the University of Wollongong to design and refine high capacity inlet structures for various detention basin projects in the Fairy Creek Catchment system. This included Wisemans Park Basin, Nyrang Park, Gilmore Park and several others.

Rudy has also undertaken significant work for the Sydney Water Corporation’s ” Strormwater Environment Improvement Program”. A number of Pollution Control Device (PCD) or Gross Pollutant Trap (GPT) PROJECTS were involved in being modelled to ensure that the diversion system proposed did not result in flooding.

Physical Hydraulic Modelling has shown itself to be extremely cost effective and provides insight into flow behaviour that no other methodology can provide.

Completed Projects Include:

Speak Your Mind

*